Tuiles et bardeaux
Deck Preparation
New Construction: Prepare roof deck to meet local building codes.
Roof Tear-off (Solid Deck): If tearing off old roof, clean and prepare deck to meet local building codes.
Re-Roof Tear-off (Skip/Spaced Sheathing): There are two options available when skip/spaced
sheathing is encountered. Use counter battens and battens without filling or fill as necessary and install just
battens.
Re-Roof Over Even Surfaces (i.e. Asphalt Shingles): Prepare the asphalt shingles by cutting
them back, flush with the fascia or rake, as needed. Remove existing hip and ridge material. Install Tile or
Shake with battens.
New Construction: Prepare roof deck to meet local building codes.
Roof Tear-off (Solid Deck): If tearing off old roof, clean and prepare deck to meet local building codes.
Re-Roof Tear-off (Skip/Spaced Sheathing): There are two options available when skip/spaced
sheathing is encountered. Use counter battens and battens without filling or fill as necessary and install just
battens.
Re-Roof Over Even Surfaces (i.e. Asphalt Shingles): Prepare the asphalt shingles by cutting
them back, flush with the fascia or rake, as needed. Remove existing hip and ridge material. Install Tile or
Shake with battens.
Proposed translations
(French)
4 | démontage de la couverture du toit (planches de revêtement espacées) | FX Fraipont (X) |
Change log
Oct 10, 2019 11:55: FX Fraipont (X) Created KOG entry
Proposed translations
5 hrs
Selected
démontage de la couverture du toit (planches de revêtement espacées)
"What is skip-sheathing?
When you think of a modern plywood roof deck, you’re not imagining gaps between the sheets of plywood. The entire roof deck is relatively uniform, where you can step on any part of it without slipping through spaces.
Skip-sheeting, or spaced sheathing, is just as it sounds: sheathing with gaps between. Traditionally, skip-sheathing consists of 1 inch by 4 inch boards nailed to the rafters with gaps between the boards. Spacing between boards is optimal for wood shakes but cannot support asphalt composite shingles."
https://www.chasenw.com/blog/skip-sheathing-as-a-roof-deck/
When you think of a modern plywood roof deck, you’re not imagining gaps between the sheets of plywood. The entire roof deck is relatively uniform, where you can step on any part of it without slipping through spaces.
Skip-sheeting, or spaced sheathing, is just as it sounds: sheathing with gaps between. Traditionally, skip-sheathing consists of 1 inch by 4 inch boards nailed to the rafters with gaps between the boards. Spacing between boards is optimal for wood shakes but cannot support asphalt composite shingles."
https://www.chasenw.com/blog/skip-sheathing-as-a-roof-deck/