Dutch term

bouwlot

Dutch to English Tech/Engineering Construction / Civil Engineering
Een bouwproject wordt onderverdeelt in verschillende loten: grondwerken, ruwbouw, dakwerken, ...
Deze (bouw) loten worden gebruikt door architecten om de bouwopdracht van verschillende aannemers toe te wijzen.
Change log

Nov 19, 2019 14:59: Lucia Leszinsky changed "Vetting" from "Needs Vetting" to "Vet OK"

Discussion

Barend van Zadelhoff Jan 19, 2020:
To me it sounds like 'subprojects'.

Once we have identified all of the things that we are supposed to produce in the project, it is necessary to develop the specific items of work that must be done to complete all of the work. The work breakdown structure takes the project and divides it into smaller pieces. These can be called subprojects. The subprojects can be broken down into smaller pieces. This process of breaking down the project can continue until the project is broken into small, more manageable pieces.

https://ebrary.net/3359/management/work_breakdown_structure_...
Barend van Zadelhoff Jan 19, 2020:
van Dale
7) lot: een bijeengenomen of bijeenbehorende hoeveelheid
Barend van Zadelhoff Jan 19, 2020:
verschillende loten De volgende fase is het opmaken van het uitvoeringsdossier in plannen, lastenboeken uit meetstaten voor de verschillende loten (ruwbouw, dakwerken, buitenschrijnwerk, elektriciteit, verwarming, sanitair, ventilatie, bepleistering, vloeren, binnenschrijnwerk, …). Op basis hiervan worden offertes aangevraagd aan de desbetreffende aannemers, de offertes worden vergeleken en in samenspraak met de aannemers onder contract vastgelegd.

https://www.amlarchitectuur.be/onze-werkwijze

- opstellen meetstaten en (commerciële/technische) lastenboeken (alle loten)

- studie technieken

- verzorgen van prijsvragen en -vergelijkingen van de verschillende loten

- opmaken van de overeenkomsten met de verschillende aannemers

- opmaak en aansturen van de planning

- alle communicatie met de aannemers voor alle loten

http://www.bralprojects.be/bouwcoordinatie.html
Barend van Zadelhoff Jan 19, 2020:
bouwloten of bouwposten 7.2 Verdeling van de kostprijs over bouwloten of percelen
Na de analyse van de oppervlaktes en het bouwprogramma, gaan we de kostprijs verder verfijnen, door de kijken naar de samenstelling hiervan in ‘bouwloten’ (soms ook ‘posten’ genoemd).
Alle bouwdossiers verlopen min of meer op dezelfde manier en hebben grotendeels een gelijke opbouw. Een groot aandeel van de bouwkost betreft de Ruwbouw (grondwerken, grote structuren, metselwerk, dakwerken, schrijnwerk) en de Afwerkingen (bevloeringen, pleister- en schilderwerken en gipskartonwanden). Daarnaast heb je een aanzienlijk deel voor Technieken
(Sanitair, HVAC, Elektriciteit, Domotica & Telefonie) en ten slotte de Vaste Uitrusting (Keuken, Liften, Vast Meubilair).

Wat deze grafieken ons leren is voornamelijk de gemiddelde verhouding tussen de loten, waarbij ruwbouw en technieken samen 70% van de projectkost omvatten en de aanzienlijke onderlinge
verschillen tussen dossiers.

Meer bijzonderheden:

http://docs.vlaamsparlement.be/pfile?id=398318
Barend van Zadelhoff Jan 19, 2020:
Intrigerend 1. De aanneming heeft tot doel het herinrichten van de bestaande leslokalen van gebouw B tot ‘MAAKLAB’. De totale realisatie van het gebouw gebeurt in verschillende loten:
LOT 0 -NIET STRUCTURELE AFBRAAKWERKEN (Vives)
LOT 1 RUWBOUW - AFWERKING
LOT 2 HVAC – SANITAIR
LOT 3 ELEKTRA – VERLICHTING - BRANDMELDING

5. Het project zal gerealiseerd worden in verschillende loten. Door het neerleggen van zijn inschrijving spreekt de aannemer een engagement uit om op een constructieve en positieve manier met elkaar samen te werken waarbij een goede en tijdige communicatie van essentieel belang is.

Omwille van het algemeen functioneren van de opleiding, zal een deel van het gebouw steeds toegankelijk blijven zodat een deel van de lessen kan blijven door gaan. Bijgevolg wordt het project gerealiseerd in verschillende fases en is het project opgesplitst in drie verschillende loten: LOT 1 RUWBOUW AFWERKING / LOT 2 HVAC & SANITAIR / LOT 3 ELEKTRA & VERLICHTING.

http://docplayer.nl/59274440-Lot-1-ruwbouw-afwerking.html


Proposed translations

15 mins
Selected

construction work package

See the following website:
https://www.designingbuildings.co.uk/wiki/Construction_work_...
“Construction work packaging
Packaging is normally associated with general contractors who split a large project into a series of work packages suitable for obtaining tenders and placing orders with the subcontracting and goods supply chain, thereby transferring risk for delivering some elements of the works to others.“
Peer comment(s):

neutral Kitty Brussaard : Not entirely sure about this one. Please have a look at https://www.carringtonwest.com/highways-england-launches-new... which suggests that lots are divided into various smaller work packages.
1 hr
You may be right :-)
Something went wrong...
3 KudoZ points awarded for this answer. Comment: "Not 100% correct (in my opinion) but the link provided allowed me to find the correct answer (again in my opinion). On the website "https://www.designingbuildings.co.uk/wiki/Work_section" the CAWS (Common Arrangement of Work Sections) or the more recent NRM 2 illustrate what I was looking for. So I will go with: bouwlot > construction work section Thanks to to all for the effort. Luc"
2 hrs

trades (construction trades)

https://en.wikipedia.org/wiki/List_of_construction_trades

I think the last sentence points to the fact that trades are involved.

This is just a list but for example the carcass trade (ruwbouw) is one of the trades involved here.
Something went wrong...
1 hr

construction lot

In the context of procurement/contracting/bidding in general, I believe the term 'lot' is the same in English, i.e. large contracts are divided into smaller 'lots'. In this specific context (construction bidding), 'construction lot' seems a good option.

http://www.sigmaweb.org/publications/Public-Procurement-Poli...

https://www.government-online.net/bradford-council-construct...

For Construction Lots of up to 15 units bidders will be required to have a minimum “general” yearly turnover of 500 000 GBP for the last 3 years: for these lots SME or start-ups that cannot meet the lowest level of turnover must provide evidence that they can obtain a performance bond or provide a parent company guarantee for projects over 250 000 GBP.
https://ted.europa.eu/udl?uri=TED:NOTICE:190962-2018:TEXT:EN...

n June 2014, TunnelTalk published the list of groups that prequalified to bid on each of the construction lots (Table 1).
https://www.tunneltalk.com/UK-London-27Feb2015-Preferred-bid...

--------------------------------------------------
Note added at 2 days 13 mins (2020-01-20 12:13:04 GMT)
--------------------------------------------------

As explained more fully in the first reference above, a contract can be divided into smaller lots by, among other things, service type. I believe that's the case here.

The contract could be divided in a number of ways, which could possibly be combined, for example:

• Geographical – divide the contract into four sub-regions, with each sub-regional lot covering all of the services required in the sub-region.

• Service type – divide the contract by type of service, with each service being provided across the whole region. With six lots, the services could be divided as follows: Lot 1 – general planned repairs, maintenance and emergency repairs; Lot 2 – electrical installation and maintenance; Lot 3 – gas appliance installation and maintenance; Lot 4– window replacement and repairs; Lot 5 – roof repairs and maintenance; Lot 6 – decorating.

• Value – create a “low-value” lot, using a multi-supplier framework agreement to
award contracts below EUR 20 000, perhaps also divided by service type.
http://www.sigmaweb.org/publications/Public-Procurement-Poli...
Peer comment(s):

neutral Edith Kelly : lots = sections but I think trades are meant here
30 mins
Thank you but I think you're mixing up things here. For bidding purposes, the larger project/contract is divided into smaller lots and, for practical purposes, this division is BASED ON the different types of construction work that need to be performed .
neutral Marijke Singer : I think they have passed the tender (i.e. procurement stage) and, after being given the tender, they need to split the project into "work packages". I am not sure though. More context would be good.
1 day 8 hrs
Hi Marijke, thank you for your comment and I agree that more context would be helpful. I based my answer on, among other things, the following document: http://docs.vlaamsparlement.be/pfile?id=398318 (see f.i. page 70).